100A, 200A, 400A and larger — residential, multi-meter and commercial. Permitted, inspected, and backed by a lifetime labor warranty.
Your main panel is the heart of the electrical system. Panels from the 1960s–80s were built for a fraction of today's load — no EV charger, no heat pump, no induction range, no home office. Add a recalled brand like Federal Pacific or Zinsco and you have a panel that insurers increasingly refuse to cover.
Araz Electric replaces and upgrades main panels of any size. We handle the load calculation, the PG&E application, the permit, and the final city inspection — you get a modern, correctly sized service with a clean inspection card.
Duplexes, fourplexes and apartment complexes need a service that gives every unit its own meter and main breaker, sized for the whole building. We design and install multi-meter main service equipment and coordinate the PG&E metering. Plan for a building-wide outage on changeover day, roughly 8 am to 8 pm (often earlier). Panels with four or more meters usually need a second day, with power back by about 8 pm the following day. If the panel is being relocated, we build the new service at the new location first, so even a large panel is only dark on the disconnect/reconnect day. We schedule all of this with you and your tenants in advance.
For commercial tenants and landlords we upgrade services for new equipment, EV charging, kitchen build-outs and tenant improvements — including three-phase where the utility provides it.
Every panel job follows the same path so there are no surprises: an on-site look at your existing service, a written scope and price, then permit, PG&E coordination, installation and final inspection. You'll know what's happening at every step.
Common signs are a panel rated 100A or less, a Federal Pacific, Zinsco or Sylvania label, breakers that trip regularly, no room for new circuits, or an insurance carrier asking for replacement. Adding an EV charger, heat pump, hot tub or ADU almost always calls for a service upgrade. We can confirm with an on-site load review.
Yes. Both brands have known breaker failures and most insurers will not cover a home with one. We replace them with modern, properly sized panels and provide the documentation your carrier asks for.
Yes — every panel replacement and service upgrade in California requires a permit and a city or county inspection, and PG&E will not reconnect an unpermitted service. Araz Electric pulls the permit and schedules the inspection as part of the job.
Any size. We routinely do 100A, 200A and 400A services, and larger single-phase and three-phase services for multi-family and commercial properties.
For most service upgrades, yes. We submit the PG&E application, coordinate the service drop or underground work, and schedule the disconnect and reconnect so your outage is as short as possible.
Plan on roughly 8 am to 8 pm on the changeover day, often earlier. Panels with four or more meters usually take a second day, with power restored by about 8 pm the following day. If the panel is being relocated, we build the new service first, so even a large panel is only without power on the disconnect/reconnect day. We schedule the outage with you and your tenants in advance.
Yes. Araz Electric provides a lifetime warranty on labor for every panel we install, plus the manufacturer's warranty on equipment.
Main panel upgrades and replacements throughout San Jose, Los Gatos, Campbell, Saratoga, Cupertino, Sunnyvale, Santa Clara, Mountain View, Palo Alto, Los Altos, Milpitas and the greater Bay Area — and we travel for larger projects anywhere in California. Licensed California contractor CSLB #821504, bonded and insured, in business since 1997.
Call (408) 878-5171 or request a free on-site estimate. Based in Los Gatos and serving the South Bay, the greater Bay Area and projects throughout California — we travel based on the job.
Request a Quote